FULL ISSUE

ASPIRE Winter 07 11.4 MB PDF FILE

FEATURES

HNTB Looks to Concrete’s Future 589.2 KB PDF FILE

Design firm’s experience leads it to examine the potential
that concrete provides.

San Francisco—Oakland Bay Bridge Skyway 509.4 KB PDF FILE

Built to resist the Big One

Davis Narrows Bridge 420.3 KB PDF FILE

Precast concrete bridge completed in 30 days.

Brady Street Bridge 234.2 KB PDF FILE

Post-tensioned design creates pedestrian landmark.

Penobscot Narrows 318.7 KB PDF FILE

Unique cable-stay system creates landmark bridge.

Hall Street Bridge 270.3 KB PDF FILE

Concrete bridge survives crash to rise again.

US 97 Over UPRR Tracks 227.8 KB PDF FILE

Record length precast beam ensures project meets deadline.

DEPARTMENTS

Concrete Calendar 253.6 KB PDF FILE
Aesthetics Commentary 234.2 KB PDF FILE
FHWA 80.7 KB PDF FILE
COUNTY—Prince Georges County 145.7 KB PDF FILE
AASHTO LFRD Specifications 81.5 KB PDF FILE